Damon was able to level out more of the lawn by the gabions with the dirt from digging the garage foundation. We hired the paving company to prep the driveway for the paving, but were able to put off the paving until next summer as we got the confirmation from Hal that he would be finishing the construction of our garage over the winter. Damon put in the third row of the back garden since the foundation was all installed. The process of digging out those garden areas yielded enough dirt to get all of the big ditch filled in behind the path! The boys built an excellent tree house. I didn't do many projects as my extra time was spent studying for my final Praxis test at the end of July. The trees are growing great. Only a few needed to get replaced.