Tuesday, April 22, 2014

Interior Framing Complete

The interior framing is complete and the drywall is also going up.

Kitchen wall where the refrigerator and microwave will go.

The office.

Through the kitchen wall over the stairs. 

Washer and dryer hookup in the closet of the office.

Picture window in the living room.

Living room wall to the master bedroom, view from the dining room.

Gas fireplace with the other ductwork from the basement venting up the chimney.

The corner bedroom next to the bathrooms.

The bedroom closest to the front door.

View of the living room from the master bedroom.

Plumbing hookups for the bathrooms.

Bathroom vent duct work and light. 

Basement utility room with basement bathroom in the corner.

Electric panel.

PEX plumbing system.

HVAC ducting 

Basement stairs.

Basement stairs with the bottom door on the right going to storage and on the right going into the eventual family room.

All the snow that was in the basement has melted, the drain works! And those windows really are awesome.

HVAC ducting.

More HVAC ducting.

The garage.

Door into the house from the garage.

Kitchen lighting.

Water pressure is holding!

Interior wall insulation with the ceiling drywall up.

Gas fireplace in the living room.

The front door, stairway, and kitchen as seen from the living room.

Kitchen with drywall and insulation.

The hallway.

The hallway closet.

Corner bedroom.

Attic.

The piping and ductwork all to exit through the chimney.





No comments: